We did a total of 9 Bridge sections of the size. Shrink wrapping the painted sections so they could travel the 900 mile journey by a truck and arrive in perfect condition
Another section being wrapped
We did a total of 9 Bridge sections of the size. Shrink wrapping the painted sections so they could travel the 900 mile journey by a truck and arrive in perfect condition
Another section being wrapped