This area was covered to allow for the construction on a Coach House where a garage once was
Tower Crane Sealed
This tower crane opening was causing flooding until we covered the area. Any problem we can solve
Balcony Restoration
Multiple Canopies covering work areas to keep the schedules on track through winter
Large Rolling Scaffold Wrapped
After it was wrapped to allow waterproofing on a roof top in sections
Before it was wrapped
UBC Food & Nutrition Bldg
This is the collected view of our UBC project with Safetech Scaffolding. This allowed for the roof to be removed and reinstalled
McDonald's restoration
This job was to protect the restaurant while renovation continued, keeping the job on time and on budget.
Heat containment
Villas 1/4 being covered for heating purposes so the acrylic paint will adhere while the weather is below 0.
Boat winterization
A few boats wrapped up for the season.
Shrink wrap canopy with debris netting enclosure
Staying protected and on schedule was the goal for this high rise construction site.
Temporary roof
This shrink wrap roof was to protect the inside of the building to keep the project moving forward until the actual roofing is completed then the shrink wrap can be removed. This temporary roof was installed in 1 day.
Boat storage and shipping
These boats are wrapped and then stored until needed, keeping them in pristine condition.
Masonary protection
Creating a dry environment for masonary work to stay on time as well as keeping the inside of the building dry until the work is completed.
Exterior restoration
The scaffold and shrink wrap was installed to keep the project dry while the renovation progressed.
Shrink wrap shipping
Some different pieces of equipment ready to be shipped to the customer, the shrink wrap helps protect against any elements during transit.
Upper floor addition
This scaffold and shrink wrap enclosure ensures no outside elements effect the on going construction not only keeping the work area and house dry, but keeping the project on schedule.
Coast Guard boat in Drydock
This job was done to two different coast guard boats in dry dock for blasting abatement and paint work. This job was done with a cabling system for support. It took a crew of four men one week to complete with a total of over 25,000 square feet
Rooftop addition
This project was covered above a house with enough room underneath the scaffolding to allow for an addition to be added.
Crane opening protection
This shrink wrap project is to keep any rain as well as debris from falling the 11 stories to ground level. The crane will protrude out of the high rise for the next year so this will allow all projects to continue without delay until the crane is removed.
SFU Downtown Restoration
This shrink wrap project was done to protect on going restoration from the rain - keeping the restoration on time as well mitigating any potential water damage while the front facade is being replaced and repaired.
Broughton St, Vancouver
This restoration project was completed by us today